Wet the cement sand mix with a solution of 1 part bonding additive mixed with 4 parts clean water.
Dap concrete bonding additive instructions.
Shake the container of concrete bonding adhesive vigorously for a couple of minutes before opening it.
Do not mix more materials than can be used in 45 minutes.
Amount of dap bonding liquid and floor leveler additive for the batch size and then add the dry material.
The first application will serve as a primer for the final coat.
The mixed product should be quickly transported to the repair area and placed immediately.
Microsoft word sds a1 concrete bonding adhesive author.
Mix a minimum of 3 minutes.
Then pour a portion into a separate container and dilute with clean water.
12 17 2019 3 10 21 pm.
Prime with a mixture of 4 parts bonding additive mixed with 1 part clean water.
Spread the bond coat with a stiff bristle broom until the suggested coverage rate is achieved.
Mix about one part adhesive with two parts water.
Clean surfaces with damp mop and nail any loose wood flooring prior to application.